Completion & Sub Assembly Make Up Services
|
‘Completion Run In Hole & Sub Assembly make up & Testing services’ were established by MOISS in 1985 to assist the operating oil companies to minimize rig lost time while running completions. Our well equipped warehouse facility with the most advanced bucking system to make up high chromium connection of any make, coupled with advanced joint analyzed make up computers (JAM), has proved to be the most reliable make up system to achieve a leak proof connection. High pressure testing is made safe to the extreme by pressure testing being carried out inside a 60’ feet long testing bunker. Handling of assemblies is made easy with a 5 ton over head crane operated in the division. Supervisors complete the final computerized documentation with all the specifications of the assembly. The assemblies are shipped to the field in a properly secured manner. Apart from hydro testing MOISS is equipped with one of the most advance Helium Operated Leak Detection System (HOLD). It has a maximum pressure rating of 20K psi and an advanced external sniffing system coupled with software to detect a helium gas leak. Completion Run in Hole service is another strong area of services provided my MOISS. Our highly experienced completion engineers are capable of running any type of completion such as singles, duels, multi lateral, and gas. Through the help of MOISS’s advanced completion-running procedures, we have achieved record running times of all types of completions and have gained the total satisfaction of oil operating companies. |
